Skip to content
EvoGen SolarSolar & storage, Washington, DCCall 24/7(202) 978-0232

Virginia coverage, answered 24/7

Solar installers for Alexandria, VA homes and townhouses

The calendar matters in Alexandria right now. Dominion interconnection applications approved before May 1, 2027 keep today's net metering terms, and Virginia's 2026 ruling kept those terms one to one. We help Alexandria owners get the design, permit and application moving in time.

Homes with rooftop solar in Alexandria, VA

Solar in Alexandria at a glance

Utility
Dominion Energy
Key date
Approved before May 1, 2027
Batteries
Dominion VPP pilot
Updated
October 2026

Short answer

Solar in Alexandria, VA is net metered one to one by Dominion under Virginia's April 30, 2026 order, and interconnection applications approved before May 1, 2027 stay on those terms. Virginia also exempts solar equipment from its 5.3 percent sales tax and residential systems up to 25 kW from property tax.

Timing

Why May 1, 2027 is the date to watch

Under the net metering tariff Dominion filed after Virginia's April 2026 order, interconnection applications approved before May 1, 2027 stay on the current terms. A solar project has several steps before that approval, from design and permits to the utility's own review, so the practical deadline arrives earlier than the date suggests.

We map those steps for your house at the first visit and file as soon as the design is settled.

Solar on Alexandria, VA townhouse roofs

Batteries and backup

Storage in Dominion territory

Most Alexandria owners add a battery for outages rather than savings, since one-to-one net metering already credits daytime solar. Dominion's Virtual Power Plant pilot for home batteries can add a payment for letting the utility draw on the battery at peak times, with a trade-off in reserve.

We set the battery's reserve so the outage protection you paid for stays there, and explain how the pilot would change that before you enroll.

Planning a Dominion interconnection timeline

How a job runs

Approvals, inspection and handover

The job runs through a city building and electrical permit, Dominion's interconnection review, installation, inspection and approval to operate. Townhouse owners often need association sign-off as well, and we provide the layout and equipment details those reviews ask for.

After turn-on we set up monitoring, show you the battery reserve settings if you added storage, and register the system's Virginia credits.

Work we do in Alexandria

What Alexandria owners call us about

Residential Solar Panel Installation

New systems with the Dominion application filed early.

See this job about Residential Solar Panel Installation

Battery Retrofit for Existing Solar

Backup added to a system that already produces.

See this job about Battery Retrofit for Existing Solar

Critter Guard & Pigeon Proofing

Mesh and skirts that keep birds out from under panels.

See this job about Critter Guard & Pigeon Proofing

Solar Maintenance & Annual Inspection

A yearly check of wiring, racking and output.

See this job about Solar Maintenance & Annual Inspection

Solar Inspection for Home Sales

Inspections and transfer checks for a house sale.

See this job about Solar Inspection for Home Sales

Straight answers

Solar questions from Alexandria

Tell us what you want the system to do

Give us the address and the goal: lower bills, backup power, an EV charger or a fix. We will say plainly whether it fits and what the job involves.

Phones answered 24/7 from our 4702 14th St NW office.

Call 24/7(202) 978-0232

Call us, or find the office

Hours
Answered 24 hours a day, every day
Service office
4702 14th St NW, Washington, DC 20011
Head office
743 South Route 73, Berlin, NJ 08009

Map of our service office at 4702 14th St NW, Washington, DC. It loads only when you ask for it.

Call 24/7 (202) 978-0232